The customer has bought the doors, but the fitting visit still depends on knowing which doors they chose, what associated items are supplied and whether everything will be available. "Customer supplies materials" leaves those decisions unresolved unless the actual arrangement is recorded.

Use the attached checklist to review the handoff between purchasing and installation. It names the product, quantities, order, receiving arrangement, readiness review and process for a proposed substitution. The responsibility matrix connects each input with the person confirming it.

This is an operational planning resource. Responsibilities, warranty questions and legal rights follow the actual arrangements and applicable rules, not a generic checkbox. Use appropriate advice for those questions and competent assessment for technical suitability.

Download the Jobsworth customer-supplied materials checklist

One Word file with six planning sections, a responsibility matrix, readiness prompts and a worked internal-door supply example.

Separate purchasing and installation

Start with the scope of your offer. If the customer buys the main product, identify exactly which items your business supplies and which work you undertake. A fitting-only arrangement can still include associated materials that need their own clear boundary.

Enter the work reference, site and relevant contacts before reviewing the details. A customer may have several purchases for different rooms. Keep the selected item connected to the piece of work so a supplier message about one product does not become an instruction for another.

The example uses two customer-supplied internal doors and an installation offer. Its allocations illustrate how to record a decision. They do not establish the technical requirements of a particular door or impose the same supply split on your business.

Identify the selected product

Request the product reference and relevant specification or manufacturer information, rather than relying on a broad description or a small photograph. Two items with similar names can still need different assessment before you offer to fit them.

Record who reviews that information and the question the review must settle. The customer choosing a product does not remove the need for your appropriate task assessment. Keep a compatibility question visible until the relevant person supplies an answer.

Use the checklist’s Confirmed arrangement and Open question fields to distinguish a selection from a reviewed input. A row saying "doors selected" does not tell a colleague whether the installer has assessed the relevant information.

If the intended result is unclear, return to that question before discussing a replacement product. The customer may be trying to achieve something beyond the fitting scope you offered. Identify the request instead of assuming that purchasing an item fully defines the work.

Check quantities and associated supply

Record the quantity and basis, with the person responsible for checking it. A supplier order quantity can differ from an installed quantity. Keep the actual reviewed basis rather than copying a generic allowance or assuming the order includes every associated part.

List related items whose supply affects the offered work. In the door example, the installer identifies the associated items included in the fitting offer, then both parties confirm that boundary. Your real package needs the applicable specification and assessment.

Review the purchasing cost and installer estimate for duplication. If an item is supplied by the customer, do not quietly include the same purchase as your own material supply unless the offer deliberately explains a different arrangement.

Where a quantity remains unknown, identify the next measurement or decision. A precise purchasing list built around an unchecked assumption can become harder to correct once an order is placed. The checklist should expose that gap before it is treated as confirmed.

Define delivery and receiving

Name who orders the item, arranges delivery and is expected to receive it. These may be different people. Keep the order confirmation and expected date available alongside the relevant work reference.

Decide how a missing or visibly damaged item will be recorded and communicated through the agreed process. The person on site needs a clear contact route rather than discovering that the customer, supplier and installer each assumed someone else would investigate.

A scheduled delivery is a planning input, not evidence that the complete specified supply has arrived. Check the actual position before relying on it for attendance. Record what is confirmed and what still requires the relevant review.

If the delivery changes, identify the effect on the work and communicate a revised plan through your normal process. The customer’s supplier message does not automatically update a booked team or another contractor’s attendance.

Review storage and site readiness

Use the actual product and site information to assess storage, access and preparation needs. The template provides fields for the arrangement; it does not prescribe a universal storage method, handling practice or technical condition.

Identify who confirms the inputs needed before fitting. For the door example, the named installer reviews the actual task and site requirements. Keep that review distinct from a general note that the customer has cleared a room.

Where preceding work belongs to another person or package, add it to the responsibility matrix. An installer cannot infer from a broad "ready" message which conditions have been checked and which remain open.

Keep the relevant evidence or reference beside the confirmation. A colleague arranging the visit needs to know what was reviewed and by whom. If readiness is uncertain, assign the clarification before treating the diary date as a workable commitment.

Agree how problems and substitutions are reviewed

Establish the contact route for supplier questions and proposed replacements. A customer may be offered a different product after an availability problem. That substitution can need another assessment of the scope, supply and programme.

Record the proposed change before confirming fitting on the original terms. Obtain the relevant product information and review what it changes. An item described as equivalent by a supplier is still information to assess for the actual work.

Keep any commercial adjustment identifiable through your offer or change process. The checklist can preserve the request and responsibility, but a revised price or scope needs its own reviewed decision. Do not turn a purchasing update into an assumed extra charge.

Where a dispute concerns fault, returns, warranty or liability, review the actual contract, supplier terms and applicable rights with suitable advice. This operational form helps retain facts and contacts; it does not decide those questions for every supply arrangement.

Use the matrix to find the gap

Complete each matrix row with the input or event, agreed responsibility, supporting confirmation and open action. Read across the row to see whether a named person can actually provide what the next stage needs.

A row may expose a practical gap rather than a dispute. Nobody may yet have arranged to receive a delivery, or the product reference may still be missing. Assign that action without presenting an incomplete plan as proof that somebody breached an obligation.

Keep the worksheet current as choices are reviewed. Retain enough context to explain a substitution or changed attendance arrangement, and communicate the relevant outcome to the people relying on it.

Check one supply arrangement before attendance

Choose one job involving customer-supplied items and identify the product, supply boundaries, quantities and receiving plan. Complete the readiness prompts with actual confirmation or an open question, then assign the first unresolved input.

Use the completed example for structure and remove it from the copy you issue. The useful record lets the customer and team understand which contribution each has agreed to make before a purchasing choice becomes an installation expectation.

Sources and further reading

Keep readiness with the scheduled work

Explore Jobsworth scheduling and Visits for the work and team arrangements. The checklist is a separate planning resource.