"Kitchen needs finishing" does not tell the next person which item to inspect or what result would close it. A contractor snagging list needs a precise location, a relevant agreed basis and a record of the recheck, not just a row somebody has ticked.
The attached Word template tracks actual outstanding items against the work you are reviewing. Its example entries show a cabinet-front query awaiting recheck and a decorating touch-up still open. Neither is presented as a completed inspection.
Use this as an allocation and review record. It is not an exhaustive technical inspection specification, a safety assessment or a completion certificate. Appropriate project-specific review establishes what needs checking and what acceptance or completion means for the actual agreement.
Download the Jobsworth contractor snagging list
One Word file with a blank item tracker, two example entries, before-closure prompts and an unresolved-item handover summary.
Define the work being reviewed
Enter the project, address, relevant agreement or specification references, review date and people involved. If the work covers several rooms or packages, establish which part the list concerns before assigning items.
Use a list reference and revision so the team can identify the current record. A later visit may add an item or change its status, but should not erase the context of the earlier observation. Keep the relevant history available through your normal work records.
Check the actual basis of the review rather than use a generic list as proof that every requirement was examined. A simple refurbishment tracker can help coordinate known items while specialist or regulated matters need their appropriate assessment and process.
Locate each item
Give each observation an ID and a precise area. "S01, east kitchen cabinet" is easier to retrieve than a note attached only to the customer name. Use the naming method your team can understand on a return visit.
Describe what was observed without inventing its cause. An alignment query or a visible finish issue needs a relevant review; it does not automatically establish a technical diagnosis or responsibility for the correction.
Include a supporting image reference where useful. An overall view can locate a detail photograph, while the note identifies the item under discussion. Replace sample references with actual evidence rather than assume a colleague will recognise an unexplained close-up.
Keep one distinct item per row where that helps assign and close it. Combining several locations under "snags" can leave an apparently completed row even though one issue remains. Separate the observations whose outcomes need their own review.
Connect the observation with the agreed basis
Identify the drawing, specification, included scope or question relevant to the item. That gives the reviewer a basis for deciding what needs correcting, clarifying or assessing further. A personal preference and an agreed requirement may raise different conversations.
The example cabinet-front entry refers to the agreed drawing and specification for review. It does not supply a universal dimensional tolerance. Obtain the competent assessment and applicable information for the actual item.
If the customer requests different work during a review, retain that as a request and route it through the appropriate scope process. Do not silently turn a new specification into an existing snag merely because it was mentioned at the same visit.
Where the agreement or assessment is unclear, name that question before assigning a correction. The list should help resolve the uncertainty rather than imply that a row automatically establishes what one party must do.
Assign the correction and target
Name the person responsible for the next contribution and choose a reviewed target or action date. The owner may need to inspect, obtain information or carry out an agreed correction. Describe which contribution applies instead of assigning "sort out".
Check what that person needs before the action. A return visit may require access, a selected material or another task to finish. Keep the dependency visible and resolve it through the relevant planning record.
If several trades are involved, identify the interface rather than assuming one broad owner covers all work. A correction can need coordination without every related task belonging to the same supplier package.
Use an actual practical timing arrangement, not a deadline invented to tidy the list. A target can guide an internal review while a confirmed attendance needs its own communication and scheduling. Record the distinction for the colleague preparing the visit.
Use status to describe the position
The template suggests Open, In progress, Ready for recheck and Closed. Those labels help describe what happened without combining the correction and its review. Adapt your working method where necessary while keeping the meaning understandable.
The sample cabinet item is Ready for recheck, with no closure evidence recorded. That means the next reviewer still has a contribution to make. The decorating item remains Open until its actual correction and subsequent check are recorded.
Changing a status is not a substitute for the event it describes. A person marking a row Closed should have the relevant review result and evidence rather than rely solely on another note that says work was done.
Record the recheck
One return visit may address several items, but retain a result for each ID. A note that the team attended does not explain which observations were corrected and reviewed. Group the work practically for access and scheduling, then record the individual outcomes. If one item is ready for closure while another needs information, preserve that difference instead of marking the entire list complete at once.
Use the closure field for the reviewer, date, result and evidence. The before-closing prompts ask whether the location is identifiable, the agreed basis checked, correction recorded and any remaining condition visible.
Choose a reviewer with the relevant information and competence for the item. The tracker can record their outcome but cannot perform the technical judgement. A photograph may support review without establishing every aspect of the completed work.
If the recheck finds another question, retain it with its actual next responsibility. Do not erase an unresolved condition because most of the correction appears complete. The team needs to know which part can be closed and which still needs attention.
Select relevant evidence for sharing. A customer may need to see the corrected location while unrelated private information stays in the appropriate work record. Review the attachments and explanation together before distributing the list.
Prepare the unresolved-item handover
The final section summarises open items, their effect on the agreed handover, return access, missing information and next review. Use it to make the remaining plan visible without replacing the detail in each item row.
Keep closure of one item separate from overall Job, contractual completion and payment decisions. The list records a specific review outcome; the wider agreement and financial records establish their own positions.
If an access or contractual question remains, identify the appropriate action rather than assume a right to return because an item is on the list. Arrange the actual attendance and relevant review through your normal process.
Use the tracker on one defined package
Download the Word file and complete the blank tracker for a specific work area. Remove the sample pages from the version you issue, then check whether each item has a location, agreed basis, next owner and actual status.
Review one row ready for recheck and retain the result before closing it. A useful snagging record gives the team a clear route from observation to correction and reviewed closure, with the remaining work still visible.